We delivered specialist IRATA-certified de-vegetation and rock descaling works to enable safe access for rock drilling. The scope included the installation of toe and crest anchors up to 3m deep, along with soil nails to support rockfall protection systems. Due to instability within the rock cutting, these remedial works were critical to maintaining rail safety. In total, we installed over 200 DYWI hollow bar RS32-360 steel bars and 1,900m² of erosion matting and rock netting.